Wuxi International Data Center

honggarae 03/11/2021 1028

Basic information

Data center level: ★★★★★

Power guarantee: dual mains and UPS power supply guarantee

Export bandwidth: Telecom 120Gbps/Unicom 20Gbps

Data center test IP: 58.215.43.198 (Telecom) 122.192.68.1 (Unicom)

Data center address: Taihu Xinchengjing, Wuxi City, Jiangsu Province No. 88 Huidong Road

Data Center Introduction

Wuxi International Data Center is located at No. 88 Jinghui East Road, Taihu New City, Wuxi City, Jiangsu Province. It is China Telecom’s highest-level data center in Jiangsu Province. The entire data center is built in accordance with Tier4's highest level industry standards. The export bandwidth of China Telecom is 120Gbps, and the export bandwidth of New Unicom is 20Gbps. The first phase of the data center can provide 657 standard racks and 16000KVA power supply. It is mainly for users with high bandwidth needs such as the Internet industry, online games, and videos to provide extremely high infrastructure and resource cost performance. At the same time, for enterprise business disaster recovery, portals It is also a good cost-effective choice.

Basic parameters

▪   Independent data center building, withstand 8 magnitude earthquakes, resist strong storms and lightning strikes

▪ Total construction area: 70,000 square meters

▪   Managed area area: 3,300 square meters

▪   Maximum floor load: 1200 kg

Security system

▪   7*24 professional security guards and patrols< /p>

▪   Strict supervision of entry and exit personnel and document review

▪   Magnetic card two-way access control system, record keeping for 1 year

▪   7*24 hours video surveillance, video saving 1 Month

Air Conditioning System

▪  Carrier's water-cooled unit

▪ Host system redundancy level: 2 (N+1)

▪ Upper ventilation, lower air supply design, cold and hot island design

·····························································

■ Air humidity range: 40%~55%

Power system

■ 1600KVA*2 dual mains connection

■  Phase I Equipped with 4 sets of KVA UPS units (2+1)

■ UPS battery discharge time exceeds 30 minutes

■ 400KVA*4+1 diesel generating set, 250 square meter oil depot, oil storage 48-hour consumption

■ Gas station priority fuel supply agreement guarantee

■ Generator weekly inspection, monthly drill

■ 99.99% continuous power supply guarantee

Fire fighting system

▪ Automatic manual gas fire extinguishing system

▪ Environmental protection fire extinguishing gas (IG541)

▪ Fireproof, waterproof and anti-static in hosting area Isolate building materials

▪ Fire protection system weekly inspection, monthly drill

Network access

▪ 120GB access to China Telecom backbone network

 20GB access to China Unicom backbone network

Latest: Sample and hold

Next: U.S. Republican Party